All the best projects put pressure on you. A little bit of pressure means that you were ambitious and that the project is difficult and worth doing.
Stevie is a robot that I helped my research group to build, here’s a picture https://www.thesun.ie/wp-content/uploads/sites/3/2017/11/msemail_science_week_-_dara_o_briain_and_robot-5jpg-js366580261.jpg?strip=all&w=960&quality=100 .
There was a lot of pressure when we were building Stevie, we had a deadline where he had to be working for a show and we didn’t sleep very much in the week running up to that show. We were working right up until the night before and it all worked out in the end.
Comments